The following are the steps to follow for the correct unpacking, installation, change of fuses and connection to the electrical network of your MAP device:
-
4.1. – Unpacking
-
4.2. – Mounting
-
4.3. – Change of the Fuse
-
4.4. – Connection to the Mains